Construction works of Ceyranbatan-Absheron-Balakhany-Ramana-Zira-Pirallahi main water pipeline and central reservoirs located along that pipeline

  • Client: Azersu OJSC
  • Project location: Absheron Peninsula
  • Scope of work: The project includes the construction of a 10.4 km long main line (DN1620 mm) and 4 reservoirs of 10,000 m³ each in the Balakhani storage complex. The installation of metal pipes DN630 - DN2220 in control distribution rooms is 900 m.
  • Project duration: 2022-2024