Drilling of subartezian and artezian wells in 38 cities and regions of Azerbaijan Republic
- Client: Amelioration and Water Resources of the Republic of Azerbaijan
- Project location: 38 cities and districts
- Scope of work: Within the framework of the project 185 subartesian and 15 artesian wells were drilled in 177 locations. The diameters of the wells are 168 mm, 219 mm and 273 mm, and the drilling depths vary from 120 to 350 meters.
- Project duration: 2021-2023