Road to a modern tourist infrastructure on the territory of the mud volcanoes in Absheron District

  • Client: Azerbaijan Tourism Agency
  • Project location: Absheron / Azerbaijan
  • Scope of work: Within the framework of the project 60,000 m2 earthworks, 222,000 m2 asphalt works and 64,000 m2 gravel works have been implemented
  • Project duration: 2022