The construction of the factory with a total construction area of 71,000 m2 was completed on a turnkey contract.
Sumgait Tobacco Factory
- Client: Tabaterra CJSC
- Project location: Sumgait / Azerbaijan
- Scope of work: Turnkey
- Project duration: 2017 – 2018