Reconstruction works of the Shirvan irrigation canal (1st and 3rd stages)
-
Client: Azerbaijan State Water Resources Agency
-
Project location: Yevlakh, Mingachevir, Goychay, Kurdamir, Hajigabul / Azerbaijan
-
Scope of work: The first stage of the project includes the construction of the 4 km long Upper Shirvan canal, one bridge over the canal, an aqueduct, a pedestrian bridge, a culvert, intake, crossing and outlet facilities, a control building and two weirs. The third stage includes the construction of a 62 km long canal, 16 automobile and 7 pedestrian bridges, 17 weirs, 4 underpasses, 4 evacuation facilities, culverts, as well as the construction of the pumping station, the Goychay HPP intake facility and the Goychay HPP outlet channel, as well as 8 rainwater collection channels.
-
Project duration: 2024-2027