Reconstruction of water supply and sewerage system of Mingachevir

  • Client: Azersu OJSC
  • Project location: Mingəçevir
  • Scope of work: More than 90 km long sewage lines (DN200-DN1000) have been renewed in the city of Mingachevir, and a pumping station with a capacity of 360 l/second has been built on one collector line. Also, construction of 1,650 m microtunnel lines is planned. The total number of house connections on sewage lines is 7,000 units. Construction works are ongoing.
  • Project duration: 2021-2026