• Client: Agro Dairy
  • Project location: Tovuz / Azerbaijan
  • Scope of work: Infrastructure & Pipeline
  • Project duration: 2016-2017

Excavation & backfilling

Excavation = 583404 m3

Backfilling = 510618 m3

HDPE steel pipe works

DN 1700 steel pump pipe = 15900 meters

DN 1000 steel pump pipe = 9250 meters

DN 800 steel pump pipe = 6000 meters

Pipe works:

HDPE pipes = 123300 meters